Username or Email Address
Password
Remember Me
Reset passwordorCreate account
Search for Products, Case Studies or keywords and hit enter to search
We create beautiful interiors with exceptional, flawlessly crafted, glazed partitioning systems. We have manufacturing facilities in the UK and in Malaysia. Our design teams work with the latest BIM technology and our highly trained and experienced installation teams ensure we meet the highest standards on-site.
We have a full manufacturing service at our UK facility near Bath and our Malaysian facility in Kuala Lumpur. Innovation and quality are key to us.
We believe that investment in product design is critical and our design teams continually work to create innovative product solutions.
Our project managers are committed to delivering the highest quality projects on time and within budget, ensuring direct and close quality control.
Now more than ever we understand the importance of developing products and processes which minimises material resource use, and ultimately reduce our impact on the environment around us. We are dedicated to protecting the environment and therefore we have introduced the Take Back to Give Back service. This new initiative is designed to support our clients as well as give us full control over the entire lifecycle of our products. We are now offering a full take back service for any Optima installed products. We will safely demount our products, separating them into principal material components, and return them to our UK manufacturing facility.
Designing products and processes which incorporate and utilise reusability and the Circular Economy will be key to how we work in the future. We recognise that our clients are looking for more sustainable solutions which can adapt and evolve as they do. We are developing innovations that will support our clients changing needs whilst giving us full control over the supply chain of our glass partitioning systems. Watch this space!
Read our client testimonials on what it’s like to work with us
We feel that during the concept stage of design this was very well put together by Alan to convey to the Architect and was a better finish than what was drawn up. This was carried on through the project, where the end result was received as “beautiful” by the client.
Worked with us throughout the process and helped resolve problems as they happened.
I would like to thank Vish, Matt and all of your operatives as they have all been a pleasure to work with whilst delivering an excellent product in a tight timescale in quite difficult surroundings.
Extremely difficult installation conditions – Optima worked well with our HS Manager Mark Mersh to develop a safe system for the operatives to work
Optima worked very well. The conditions onsite forced you to adapt to night working and develop working methods of installation. Steve and the guys were great throughout and Liam was always available to answer calls on both day and night shifts. Optima were always positive and pushing the project forward. Optima team worked very well and highly recommended.
Found the process start to finish was 1st class given the very tight programme. Staff on site were great to deal with. Issues dealt with quickly and looking forward to our next project.
Andy Davie is great to work with, very proactive, responsive, understood what we needed to do and delivered.
Quality is very good and the finished office looks great, client is very happy. Can’t find fault with the performance on this project. Great job well done!
Overall attitude of the manager and site team was good and was a can-do attitude – great team to work with really good product.
Great communication throughout the project no improvement required.
Implementing safe working practices during COVID-19. Clear line of communication throughout Project Team.
Our experience is vast, as we operate within a range of sectors such as Commercial, Pharmaceutical Research and Education.
Glass partitioning can transform commercial office space, creating a sense of openness and transparency whilst maintaining acoustic privacy between activities.
Pharmaceutical research buildings by their nature have a unique combination of specialist requirements for glazed partitioning, including security, acoustic performance and infection control.
Media centres and recording studios demand the highest acoustic standards and require exceptional levels of expertise and precision when designing and installing acoustic glazed partitioning.
A comfortable acoustic environment, aesthetic design and exceptional fire performance are important considerations in leisure and recreational environments.
With a range of legislative controls and a need for robustness and acoustic performance, education buildings can be challenging environments for glazed partitioning.